Jun 04, 2020     Rivet servo ribs into elevator frame - (1.5 hours)       Category: Empennage
Debured and riveted nut plates into two ribs that will hold trim servo. Riveted these ribs into elevator frame. Was short an elevator trailing edge skin so set assembly aside and will move back to work on horizontal stabilizer.


 